top of page
Moving on from building ordinary

Owen Ethan Laboratory Suite 316
Experiment Boldly.
Location:
Florida International University Modesto Maidique Campus, Miami, Florida
Client:
Florida International University, Facilities Management
Size:
900 SF
Studio:
Educate
Description:
MOBIO professional services were retained for the interior renovation of the new chemistry teaching laboratory at FIU’s Owa Ehan building. The new lab provides 18 stations along with four (4) Airfoil Bypass Laboratory Fume hoods and a Glove Box with valves for natural gas, compressed air and central vacuum. The casework specified included high pressure laminate and epoxy resin countertops with sinks integrated to be chemical and thermal resistant.
bottom of page





